NORTH YORK · SERVING THE GREATER TORONTO AREAContact our team · (647) 453-2383
PROJECT 04 · KITCHEN RENOVATION

A kitchen transformation, from floor to ceiling.

Blue-grey cabinets and an illuminated panel ceiling gave way to white cabinetry, a veined backsplash, grey floor tiles and warm perimeter lighting. Follow the same kitchen through 13 photographs: the starting point, the work around the room and the completed result.

13 project photographs · Select any photo to enlarge it.

01 / THE STARTING POINT

An update to the original cabinets, surfaces and ceiling.

The first photograph records the room before the renovation: blue-grey cabinet fronts, a tiled backsplash and the illuminated panel ceiling. The stainless-steel refrigerator at the back of the room helps connect this original view with the progress photographs and the finished kitchen.

Kitchen before renovation with illuminated ceiling panels, blue-grey cabinets and stainless-steel appliances.
01

The original kitchen

The original kitchen, with its illuminated panel ceiling and blue-grey cabinets.

The whole room matters.

This project brings several parts of a kitchen renovation into one sequence. The difference is visible in the cabinet fronts, the counters and backsplash, the flooring and the ceiling. Showing the room before work began gives those finishing details a clear point of comparison.

For a similar project, start with photographs of the whole kitchen and the areas you want to change. Cabinet storage, work surfaces, flooring and lighting can then be discussed together when defining the scope.

02 / THE WORK

The work behind the finished kitchen.

New ceiling boards and prepared joints came before the finished lighting. Open cabinets, protected appliances and work at the sink show the room during reconstruction, followed by flooring, cabinet finishing and clean-up.

02a

Rebuild and prepare the ceiling

New ceiling boards are fixed in place and the joints are prepared around the lights. Appliances stay protected as the room changes around them.

Worker on a ladder fixing new kitchen ceiling boards above blue-grey cabinets, with Rachelle beside the counter.
02

Fitting the new ceiling boards

Ceiling boards are fixed above the original cabinets while work continues around the room.

Kitchen renovation in progress with workers on ladders, exposed cabinet interiors and Rachelle in the foreground.
03

The team at work

A view from the doorway during ceiling work, with ladders, tools and open cabinets.

Kitchen ceiling with white joint compound over drywall seams and fixing points, and recessed lights switched on.
04

Preparing the ceiling joints

Joint compound covers the board seams and fixing points around the recessed lights.

Kitchen during reconstruction with a patched drywall ceiling, open white cabinets and a refrigerator covered in protective plastic.
05

The room during reconstruction

Protected appliances and open cabinet interiors show the kitchen before the finishing work is complete.

02b

Work through the room

The photographs move between the hood, cabinets and sink area, then show the smoother ceiling and new stainless-steel hood with work still underway.

Original kitchen extractor hood beneath an open cabinet with exposed ducting and unfinished ceiling joints.
06

Working around the extractor hood

The cabinet above the original hood remains open, with the duct and ceiling joints visible.

Workers around a kitchen sink and counter with tools, protective coverings and unfinished ceiling joints.
07

Work at the sink and counter

The team works around the sink and counter while the surrounding finishes are still in progress.

Smooth kitchen ceiling above open cabinets, with temporary hanging bulbs, a ladder and protective sheeting during renovation.
08

A smoother ceiling takes shape

The ceiling surface has been finished; temporary bulbs, ladders and protective sheeting remain in place.

New stainless-steel extractor hood above a stove during kitchen renovation, with cabinet fronts still open and protective plastic nearby.
09

The new hood in place

The stainless-steel hood is in place while the cabinet fronts and surrounding details are still being completed.

02c

Bring the finishes together

Floor tiles, cabinet fronts, counters and backsplash come together before the final clean-up.

Grey kitchen floor tiles held with red leveling clips, with an appliance moved into the room and tools on the counters.
10

Laying the floor tiles

Red leveling clips hold the floor tiles while appliances and tools remain in the work area.

White kitchen cabinets, veined backsplash and perimeter lighting during installation, with lower cabinet openings and tools still visible.
11

Fitting out the kitchen

Cabinets, counters and the ceiling lighting take shape while lower cabinet openings and tools remain visible.

Rachelle working at the kitchen counter during clean-up, with white cabinetry, grey floor tiles, a broom and unfinished outlet visible.
12

Finishing and clean-up

Finishing and clean-up underway, with the new floor and cabinetry in place.

03 / COMPLETION

White cabinetry and a finished lighting scheme.

The completed-room photograph shows the kitchen from the entrance, with Rachelle beside the counter. White cabinet doors, a veined backsplash, grey tiled flooring and the finished ceiling now form one consistent room.

Completed white kitchen with perimeter ceiling lighting, recessed lights, veined backsplash, grey floor tiles and Rachelle beside the counter.
13

The completed kitchen

The completed kitchen brings together white cabinetry, a veined backsplash, tiled flooring and ceiling lighting.

From panel ceiling to perimeter lighting.

The original ceiling grid has given way to a smooth ceiling with recessed lights and a warm band of light around its perimeter. Below it, the kitchen includes white cabinetry with metal handles, open shelving, a double sink and stainless-steel appliances.

The original and completed views bookend eleven progress photographs, showing the practical work behind the change in the room.

NORTH YORK · TORONTO · THE GTA

Planning your kitchen renovation?

Raras Renovations works with homeowners in North York and across the Greater Toronto Area. Share the kitchen’s current condition, the changes you have in mind and your priorities for the space. Include your location, approximate dimensions and timing so the team can discuss an assessment and prepare a scope for your project.

What this project shows.

One original-room photograph, eleven views of reconstruction and finishing, and one completed kitchen. The sequence covers ceiling boards and joint preparation, work around the cabinets and hood, floor tiling, and the final surfaces and lighting.

Discuss your kitchen renovation
Talk about your next project.Call our team